Construction sites, demolitions, and short-term events all need electrical supply before or without a permanent connection in place. Temporary power is exclusively Level 2 ASP work — from the initial connection to the network through to the disconnection and removal when the project ends. Sydney Power Group manages the full temporary power lifecycle across all of Greater Sydney.
Builder's Temporary Supply
A builder's temporary supply is the standard connection used during construction — a temporary metering panel and service connection installed before the permanent switchboard is in place. We apply for and install builder's temporary supply connections across Ausgrid and Endeavour Energy zones. The connection is installed with a temporary meter that records consumption so the builder can manage site power costs, and is removed when the permanent connection is ready.

Construction Site Power Connections
Larger construction sites — multi-lot developments, commercial builds, and strata projects — require more than a standard builder's supply. We design and install temporary distribution infrastructure for sites with high power demand, including temporary main switchboards, sub-distribution, and metering arrangements that satisfy Ausgrid and Endeavour Energy requirements and keep your project compliant throughout the build.

Demolition Disconnections
Before a demolition crew can safely start, the property must be formally disconnected from the network at the service level — not just switched off at the main switch. We carry out safe network disconnections for demolitions across Sydney, lodging the formal notification with Ausgrid or Endeavour Energy, removing or capping the service connection, and issuing the disconnection certificate your demolisher and insurer needs.

Temporary Supply Removals
When construction is complete and the permanent connection is ready, the temporary supply needs to be properly removed and the final connection activated. We manage the switchover — coordinating the outage window with the network, removing the temporary metering panel, confirming the permanent connection is live, and lodging the as-built compliance paperwork with the distributor.

Event and Short-Term Supply
Events, markets, and short-term installations sometimes need a network supply connection where a generator isn't suitable. We coordinate temporary network supply connections for events across Sydney — managing the application, installing the temporary infrastructure, and disconnecting it when the event ends. Call us early in your event planning process, as network applications have minimum lead times.


Call us now for a no-obligation quote. Emergency response available 24/7 — on-site within 60 minutes across Sydney.
0466 125 125Get a Free QuoteWhat We Cover
- Builder's Temporary Supply
- Construction Site Power Connections
- Temporary Meter Installation
- Demolition Disconnections
- Event & Short-Term Supply
What Sydney Says About Us
Don't take our word for it — read genuine reviews from real customers who booked our temporary power supply sydney service on our Google profile, or leave one after your job is done.
Read Our Google ReviewsRecent Work




OUR OTHER LEVEL 2 SERVICES
READY TO GET CONNECTED?
Free assessment on any network electrical job. Emergency? We answer around the clock.