
Installing an EV charger is straightforward for a standard electrician — but the supply infrastructure behind it isn't. When your EV charger draws more than your current service connection can safely provide, or you need to install multiple chargers in a strata car park without overloading the building's incoming supply, you need a Level 2 ASP. Sydney Power Group designs and installs EV charging infrastructure that actually works within your network capacity.
Home EV Charger Infrastructure
A fast home EV charger (7kW or above) draws as much as two ducted air conditioning systems simultaneously. If your home's incoming supply is a standard single-phase 63A connection, you may be right at the limit before the charger is even factored in. We assess your existing supply, calculate your available capacity, and either confirm your supply is adequate or carry out a supply upgrade so your charger performs correctly without tripping your main fuse.

Strata and Multi-Tenancy EV Charging
Strata buildings face a more complex problem: multiple residents wanting to charge simultaneously, sharing a single incoming supply. Unmanaged EV charging in a strata car park can overload the building's infrastructure within months of the first few chargers being installed. We design and install managed EV charging systems with embedded load management that automatically limits simultaneous draw — so every resident can charge without the building's supply ever being exceeded.

Commercial EV Charging
Retail car parks, commercial buildings, and fleet depots require EV charging infrastructure designed to handle high-utilisation loads across multiple bays simultaneously. We assess the existing supply infrastructure, design the charging system around your demand profile, manage the network application for any required supply augmentation, and install the complete system with metering for cost recovery if required.

Solar Integration and Battery Storage
EV chargers paired with rooftop solar and battery storage require careful metering and supply configuration to operate correctly under network export rules. We configure bi-directional metering, coordinate the Ausgrid or Endeavour Energy technical requirements, and ensure your combined solar, battery, and EV charging system is fully compliant and optimised for self-consumption.


Call us now for a no-obligation quote. Emergency response available 24/7 — on-site within 60 minutes across Sydney.
0466 125 125Get a Free QuoteWhat We Cover
- Home EV Charger Installations
- Strata Car Park EV Infrastructure
- Load Management Systems
- Supply Upgrades for High-Draw Chargers
- Ausgrid & Endeavour Network Coordination
What Sydney Says About Us
Don't take our word for it — read genuine reviews from real customers who booked our ev charging infrastructure sydney service on our Google profile, or leave one after your job is done.
Read Our Google ReviewsRecent Work




OUR OTHER LEVEL 2 SERVICES
READY TO GET CONNECTED?
Free assessment on any network electrical job. Emergency? We answer around the clock.