SUPPLY UPGRADES SYDNEY

SUPPLY UPGRADES SYDNEY

Level 2 ASP · Ausgrid & Endeavour Authorised

Adding ducted air conditioning, a large solar array, or an EV charger to an existing property can push the incoming supply beyond its rated capacity. Sydney Power Group manages the full supply upgrade process — from calculating your maximum demand to coordinating the network augmentation with Ausgrid or Endeavour Energy and carrying out the physical switchboard and consumer mains upgrade.

Single to Three-Phase Conversion

Many Sydney properties still run on single-phase 63A supply — adequate for basic loads, but not for modern high-draw equipment. A three-phase conversion increases your supply from a single 63A connection to three 63A phases, effectively tripling your capacity. We assess your existing infrastructure, prepare the technical documentation for the network application, and carry out the full conversion including new consumer mains, metering panel, and switchboard.

Single to three-phase conversion Sydney

200 Amp Upgrades

For properties that need more capacity on a single phase, a 200 amp upgrade increases your main fuse from 63A to 100A or 200A. This is a common requirement before installing a large battery storage system, commercial kitchen equipment, or multiple EV chargers. We prepare and submit the network augmentation request, coordinate the outage window, and replace the consumer mains and metering equipment to suit the new rating.

200 amp supply upgrade Sydney

Maximum Demand Assessment

Before any supply upgrade, we carry out a maximum demand calculation to confirm the right upgrade path. This prevents over-specifying (and over-spending) on capacity you don't need, and ensures the upgrade you get will actually accommodate your planned loads. We provide the assessment in writing so you understand exactly what you're getting and why.

Maximum demand assessment for supply upgrade Sydney

Network Application and Coordination

Supply upgrades require formal approval from Ausgrid or Endeavour Energy before any physical work can begin. As authorised Level 2 ASPs, we submit the technical application, respond to any network queries, and coordinate the planned outage window. In most cases the full upgrade — application, approval, and physical works — is completed within two to four weeks from initial engagement.

Network application for supply upgrade Sydney
SUPPLY UPGRADES SYDNEY
Free Assessment

Call us now for a no-obligation quote. Emergency response available 24/7 — on-site within 60 minutes across Sydney.

0466 125 125Get a Free Quote

What We Cover

  • Single to Three-Phase Conversions
  • 63A to 100A / 200A Upgrades
  • Ausgrid & Endeavour Network Applications
  • EV & Solar Load Assessment
  • Commercial & Residential Supply Upgrades
Accredited & Licensed
ASP Authorisation No. 5334
Contractor Licence 318221C
$20 million public liability insurance
ASP Accredited
ASP Authorisation No. 5334
Licensed Electricians
Contractor Licence 318221C
Fully Insured
$20M public liability + workers comp
Australian Owned
Sydney based & operated
Emergency 24/7
On-site within 60 minutes
15 Years in Business
Level 2 network specialists

What Sydney Says About Us

Don't take our word for it — read genuine reviews from real customers who booked our supply upgrades sydney service on our Google profile, or leave one after your job is done.

Read Our Google Reviews

Recent Work

Three-phase conversion Parramatta
Three-phase conversion — Parramatta
200 amp upgrade Bondi
200A supply upgrade — Bondi
Maximum demand assessment Penrith
Maximum demand assessment — Penrith
Supply upgrade Chatswood
Supply upgrade completed — Chatswood

READY TO GET CONNECTED?

Free assessment on any network electrical job. Emergency? We answer around the clock.